Vesgantti King Size Mattress,12 Inch Hybrid Innerspring Mattress in a Box with Memory Foam, Back Support & Pressure Relief, Medium Firm Feel for Adults (King Size)

Vesgantti King Size Mattress,12 Inch Hybrid Innerspring Mattress in a Box with Memory Foam, Back Support & Pressure Relief, Medium Firm Feel for Adults (King Size)

$329.98
Sale price  $329.98 Regular price 
Skip to product information
Vesgantti King Size Mattress,12 Inch Hybrid Innerspring Mattress in a Box with Memory Foam, Back Support & Pressure Relief, Medium Firm Feel for Adults (King Size)

Vesgantti King Size Mattress,12 Inch Hybrid Innerspring Mattress in a Box with Memory Foam, Back Support & Pressure Relief, Medium Firm Feel for Adults (King Size)

$329.98
Sale price  $329.98 Regular price 
Shipping calculated at checkout.

About This

  • Support and Comfort: The king size mattress features individually wrapped pocket coils and pressure-relieving foam, which work together to provide targeted support, cradle your body shape and ease the aches and pains, so you awake feeling refreshed. Note: Please keep distance when opening the mattress from the plastic packing, as it may have a risk to hit back when restoring
  • Cooling and Breathable: The cooling gel particles and air-flow between coils make the foam ventilated, expel steamy sweat, maintain a comfortable sleep environment all night
  • Isolated Motion: The individually pocket spring allow it to absorb movement from your partner, you sleep deeply and soundly never be disturbed all night
  • Healthy and Skin-Friendly: Made of foam approved by CertiPUR-US, non fiberglass, non toxic, hypoallergenic, Vesgantti mattress is an affordable and optimal option for your family
  • King Mattress in a Box: Vacuum Packed in a box, smaller size, easy to carry. We recommend allowing 72 hours for the mattress to be fully expanded. If you have any issues, please let us know without hesitation

Overview

  • Brand : Vesgantti
  • Size : King
  • Product Dimensions : 80"L x 76"W x 12"Th
  • Top Style : Tight Top
  • Cover Material : Polyester Blend
  • Number of Layers : 5
  • Fill Material : Spring and Foam
  • Weight Limit : 200 Pounds
  • Special Feature : Breathable, Hypoallergenic, Low Motion Transfer, Orthopedic, Pressure Relief
  • Color : Blue and White
  • Item Weight 100 Pounds : Item Firmness Description Medium Firm
  • : Item Weight 100 Pounds
  • : Item Firmness Description Medium Firm

Goes well with...